A data center build is not one site. It’s a chain of locations, and every link holds something worth stealing. From equipment coming off a ship in port, moving to a staging warehouse, sitting in a laydown yard, then rolling onto a project that can take two years or more to build, security must move with it.
What moves through that chain also sets a data center apart from a typical construction project. Copper and generators are tempting targets, but the bigger risk is the intellectual property (IP) loaded onto servers before they ever reach the data hall. IP must be protected at all costs. Thieves know this. Cargo theft was a $725 million problem in 2025, according to Verisk CargoNet, and AI infrastructure components are an increasingly attractive target. In AFCOM’s 2026 State of the Data Center report, human threats took the top risk spot for the first time in 10 years, ahead of ransomware. Missing parts mean project delays, and every month of delay costs a developer an estimated $14.2 million according to STL Partners.
ECAM’s guide to data center security planning explains why site protection should begin before groundbreaking. But most planning should start even sooner, before parts ever reach their final location. Here’s what’s at risk at each phase, and which protections fit.
Phase 1: In transit, where deception does the stealing
Exposure starts once materials leave the port and enter the AI infrastructure supply chain. Since June, thieves have taken more than $100 million in data center freight, according to investigators interviewed by NBC News, using hacked freight accounts, fake driver identities and spoofed GPS signals. In one case, a trailer carrying about $13 million in server equipment vanished after its security escort was rammed by another vehicle.
Securing materials in transit requires coordination with third party suppliers to track shipments and keep tabs on where containers are in real time and when they’ll arrive.
Phase 2: Staging, where the insider threat lives
This is often where proprietary software goes onto the hardware, inside leased, unmarked buildings with no permanent access control. The threat usually starts inside when someone who knows where a shipment is headed sneaks into a trailer before it leaves or hides a phone in a no-device zone.
The right security mix pairs monitored perimeter cameras with license plate recognition at every lane, temporary gate arms and turnstiles, and RF detection that locates devices in no-device zones. No area is too small to ignore.
Phase 3: Active construction, where the perimeter keeps moving
As walls go up, the site fills with steel, copper cable, generators and switchgear, and the footprint changes weekly. In October, thieves targeted a Virginia data center construction site three times in a month making off with more than $200,000 worth of copper piping and power tools.
Mobile Surveillance Units that move with the project’s footprint and provide after-hours monitoring of equipment yards and electrical rooms create the foundation. During the day, AI-powered surveillance sends alerts straight to guards on patrol at a fraction of the cost of a 24/7 guard post.
Agreeing on response protocols early in the process is another crucial step. Builders, guards and the monitoring team should settle how to handle common incidents, including from trespassers, before day one, so no one’s left guessing at 2 a.m.
Phase 4: Go-live, where the IP is running
Once servers are live, IP is running, not just stored. The owner’s security operations center takes over, and temporary systems hand off to permanent ones. That handoff is a risk. Gaps can be created as temporary surveillance cameras are pulled without permanent cameras in place.
Exposure also shifts to high-value deliveries, executive visits and outside parties who need eyes on sensitive areas without access to the owner’s network. Closed-loop systems keep that footage on site, while on-demand perimeter protection covers deliveries and visits.
Why ECAM fits every phase of the build
Protecting the data starts with protecting the hardware it lives on. Temporary security doesn’t mean temporary risk. ECAM’s solutions move with the project and work together as layers:
- Solar and cellular powered mobile surveillance units that relocate and scale as the project grows
- LPR, gate automation and device detection for staging yards
- Remote video monitoring that pairs AI detection with human verification and stops intruders with lights and audio warnings
- ECAM Central, which gives developers one view of incidents and response across every site
Every layer stays off the owner’s network, is encrypted end to end and uses no facial recognition, so protecting the hardware doesn’t add risk to the data. ECAM’s mantra is “Every Camera Always Monitored.” That’s the difference between cameras recording and a security solution that stops crime in its tracks. Data centers can’t afford setbacks. With ECAM, they don’t have to worry.
Talk to an ECAM expert about a phased security plan for your next build.
Build a Stronger Security Strategy
Download Security Guides
Practical ebooks to help you strengthen your security and solve your challenges.
Discover Industry Security Solutions
See how ECAM protects your industry with solutions designed to deter crime, reduce losses, and keep operations moving.