Ask a data center developer how they measure risk, and the answer is likely to come down to days of delay rather than dollars lost. Every week a building sits without power or operations up and running pushes revenue further out. Projects are built around tight deadlines and delivery schedules, leaving little room for unexpected setbacks. The scale of the industry adds to the pressure. According to ConstructConnect, U.S. data center projects that broke ground through September 2026 total $135.8 billion in construction spending across 178 projects, and the firm expects 2026 starts to surpass $180 billion. With that much capital committed, construction has to keep pace with AI innovation.
That makes theft on data center construction sites particularly costly. Replacing stolen copper or damaged switchgear is expensive, but getting replacement equipment can be an even bigger challenge. With some components already facing lead times of several years, a single theft can put an entire project behind schedule. Protecting these materials needs to be part of the plan well before the building is complete.
Long lead times turn a theft into delays
A Wood Mackenzie analyst told Reuters that equipment availability has become one of developers’ biggest concerns, given the value of getting projects to market on time. Current equipment lead times help explain why. Generator step-up transformers passed 160 weeks in the first quarter of 2026, up from an average of 143 weeks in 2024. High-voltage circuit breakers reached 125 weeks in the second half of 2025, compared with 77 weeks in 2023.
With lead times that long, replacing stolen or damaged equipment isn’t as simple as placing another order. A missing transformer or circuit breaker could delay commissioning and push back tenant delivery by months. According to STL Partners, each month of delay can cost a developer an estimated $14.2 million in lost revenue, cost overruns and contractual penalties on a proposed project.
What thieves go after before the building is up
Copper wire is a common target because it’s relatively easy to transport and sell. This summer, Loudoun County deputies stopped a rented U-Haul following a burglary at a data center construction site in Sterling, Virginia. Inside, they found copper wire spools valued at more than $100,000. A former FBI agent noted that data centers are becoming more attractive targets for thieves than the homes and traditional construction sites they have historically targeted.
The risk isn’t limited to active construction sites. In June, the Cook County Sheriff’s Office recovered two stolen trailers at a truck yard outside Chicago containing more than $1.3 million in cargo. One trailer held approximately $300,000 in copper wire and had been reported stolen in Alabama. The other contained roughly $1 million in data center infrastructure equipment and had been reported stolen in Florida. The sheriff’s office did not identify the intended destinations for either shipment.
Copper isn’t the only material at risk. Switchgear, transformers and servers are also targets, especially when they’re sitting in staging warehouses or laydown yards waiting to be installed. These locations may not have the same security measures as an active facility, even though they can hold millions of dollars in equipment. A theft at any point along the way can leave a project waiting on replacements.
How ECAM’s remote video monitoring covers the gap
Security measures don’t always keep pace with data center construction. Fencing, access control, and permanent security systems are typically installed as the site goes vertical. Meanwhile, equipment may already be arriving at temporary staging areas or laydown yards that don’t have the same level of protection.
ECAM closes that gap with remote video monitoring that doesn’t wait for permanent infrastructure. ECAM’s mobile units are powered by solar panels, so they can be deployed at staging areas or laydown yards early in the project and moved as equipment and construction activity shift to other locations. Each unit is backed by ECAM’s promise of Every Camera Always Monitored.
ECAM’s AI-based analytics identify people and vehicles entering the property after hours, while trained monitoring personnel review the activity and determine whether it requires a response. If someone enters the property without authorization, ECAM operators can use audio talk-down to warn them that they’re being monitored and contact law enforcement if necessary. That early warning can stop an intruder before any equipment leaves the site.
With ECAM, developers get another layer of protection during the stages when valuable equipment is on-site but permanent security may not yet be available.
Protect the schedule before the materials arrive
A data center’s commissioning date depends on more than construction progress. Equipment needs to arrive on time, remain secure and be ready for installation when the project reaches that stage. Yet some of the most valuable materials spend weeks or months at locations that may not have permanent security in place.
Developers should consider where high-value equipment will be stored throughout the project, including temporary yards and staging locations between the manufacturer and the construction site. Identifying those gaps early makes it easier to put security measures in place before materials arrive.
To learn more about how ECAM helps protect construction sites and valuable equipment with remote video monitoring, contact the ECAM team.
Build a Stronger Security Strategy
Download Security Guides
Practical ebooks to help you strengthen your security and solve your challenges.
Discover Industry Security Solutions
See how ECAM protects your industry with solutions designed to deter crime, reduce losses, and keep operations moving.